image

Welcome to WSE

Water Services Engineering Pty. Ltd. (WSE) provides multi-disciplinary Engineering Consultancy Services to industries in Queensland. Industry sectors serviced include:

  • Water and Waste Water Transportation and Treatment
  • Industrial, Mining and Process Engineering
  • Industrial Projects Power System Analysis, Protection Coordination and Arch Flash Assessment Reports

Our Services

image

On time, On Budget, & Highest Professional Standards Registered RPEQ

image

Been in operation since 2011, with many years of practical On field experience.

image

Achieve Significant
cost savings

image

End to end Management inc: design, tendering, Testing and Commissioning of the Highest Professional Standard.

image6

Water Services Engineering Pty. Ltd. (WSE) provides multi-disciplinary Engineering Consultancy Services to industries in Queensland.

Industry sectors serviced include:

  • Water and Waste Water Transportation and Treatment
  • Industrial Process Engineering
  • Industrial Projects Power System Analysis and Protection Coordination

Water Services Engineering Pty. Ltd. was formed in Brisbane in March 2011 and provides civil, structural, mechanical, electrical, instrumentation and process control engineering, design and project management services.

Water Services Engineering Pty. Ltd. has systems in place in accordance with ISO-9001:2008 and are currently working toward accreditation.

Water Services Engineering Pty. Ltd. is proud to be a privately owned Australian Engineering Consultant Company committed to providing continued competent, efficient, value for money services to its customers. Client’s requirements and continued good working relationship with them are our major goals.

NOTE: Attached bellow are two published papers that have been written by the Director of WSE

Our Recent Projects

Bowen MBR Sewage Treatment Plant – recently commissioned

Bowen MBR Sewage Treatment Plant – recently commissioned: WSE in association with Zemek Environmental has been appo

Eagle Farm Sewage Pump Station Upgrade

Eagle Farm Sewage pump station is Brisbane’s largest sewage pump station with two Dry/Wet No.1 and No.2 Wells.

Full power system analysis

Full power system analysis, protection coordination study and Arc Flash Analysis of Seqwater’s Molendiner WTP (

Full power system analysis South Lismore STP

Full power system analysis, protection coordination study and Arc Flash Analysis of South Lismore Sewage Treatment Pl

Full power system analysis Sewage Pump Stations G1-G4

Full power system analysis, protection coordination study and Arc Flash Analysis of Gympie Regional Council’s S

Full Power System Analysis Various Pump Station Sites

Full power system analysis, protection coordination study and Arc Flash Analysis of South Burnet Regional Council Kin

Full power system analysis, protection coordination study

Full power system analysis, protection coordination study and Arc Flash Analysis of Queensland Urban Utilities Rosewo

Gatton Correctional Centre Sewage Treatment Plant Design and Construction

WSE is the electrical design consultant as part of John Holland, Guidera O’Conner and Complex Electrical Group (CEG

Gold Coast Infrastructure Solutions - 26 SPS Update

Gold Coast Infrastructure Solutions – 26 SPS Update: WSE is part of GCISolutions team and has completed detail

Gold Coast Waterways Authority – Sand Bypass Pump Station HV Substations Transformers and LV Switchboard Upgrade

WSE was engaged by GCWA to provide superintendence, site supervision and inspector role for the Spit Sand Bypass Pump

Gold Coast/Allconnex Pressure and Leakage Management

WSE was engaged by Allconnex (before being disbanded) for the detailed design of 63 pressure regulating valve sites w

Gympie Reginal Council's various projects

Gympie Reginal Council’s various projects: SCADA Planning for the entire region, Control System and SCADA Upgra

Gympie Regional Council’s Coastal Regions Water Treatment Plants

Gympie Regional Council’s Coastal Regions WTP’s: Rainbow Beach, Tin Can Bay and Cooloola Cove Water Treatment

Herberton WTP

Herberton WTP: Stiloch engaged WSE to carry out detail design of all EI&C works for a new green field WTP constru

Kalbar Water Treatment Plant Upgrade

Kalbar Water Treatment Plant Upgrade Detailed Design.

WSE in association with SMEC, provided consultancy servi

Kirkleagh Water Treatment Plant & Raw Water Pump Station SCADA & Control System Upgrade

WSE was engaged by Seqwater to carry out detail design of its Kirkleagh WTP and Raw Water Pump Station main switchboa

Lismore Sewage Treatment Plant

Lismore Sewage Treatment Plant – WSE was engaged by Stirloch in 2017 to carry out full detail design of all EI&

Lowood Raw Water Pump Station Pump 4 Upgrade

WSE was engaged by Seqwater to carry out detail design of its Lowood Raw Water Pump Station new Pump 4 mechanical, el

Mirani Sewage Treatment Plant Upgrade

Mirani Sewage Treatment Plant Upgrade: currently being commissioned. WSE in association with Zemek Environmental has

Molendinar WTP Backwash System and Electrical Upgrade

Molendinar WTP Backwash System and Electrical Upgrade: WSE was engaged by Pensar Utilities to carry out full detail d

Mt. Isa Water Board Asset Condition Assessment and Future Water Strategy

WSE was the principal consultant for Mt Isa Water Board to carry out condition assessment of their entire assets, pre

Palm Island Sewage Treatment Plant

Palm Island Sewage Treatment Plant – WSE in conjunction with Ganden Engineers and Project Managers completed fu

Power System Analysis of Various Plants

WSE was engaged by various clients to carry out power system analysis, protection coordination and arc flash evaluati

Process Optimisation of Rosewood Sewage Treatment Plant (RWSTP)

The existing Rosewood STP with a capacity of 3,000 EP is located on the southern bank of the Western Creek approximat

Sewage Pump Station Upgrade

QUU has been rolling out a new generation of its High Reliability Switchboards for its sewage pump station across Bri

Stage 4A Upgrade of Goodna Sewage Treatment (GDSTP)

Goodna STP with a capacity of 90,000 EP is located on the Lower Cross Street, Goodna, QLD. The old Plant was running

Sunwater Infrastructure Power System and Arc Flash Assessment

WSE was engaged by SunWater to perform Power Systems Analysis and arc flash assessment on their thirty nine major pum

Unitywater Bribie Island STP – Switchboards and Control System Upgrade

Unitywater Bribie Island STP – Switchboards and Control System Upgrade: WSE has been engaged by Unitywater to desig

Unitywater’s multiple sewage and water pump stations

Unitywater’s multiple sewage and water pump stations: WSE has been appointed as the preferred design consultant for

WSE As initiative of Arc Flash Hazard at Electrical Instilations

WSE is one of the initiative companies in Queensland who started the awareness on arc flash issues on electrical inst

WSE in association with Zemek Environmental

WSE in association with Zemek Environmental was appointed as the clients engineering representative for Sarina Wastew

WSE was engaged by Comdain Constructions

WSE was engaged by Comdain Constructions to provide the engineering design of Design and Construct augmentations to t

WSE was engaged by QUU to provide electrical, instrumentation, and control system

WSE was engaged by QUU to provide electrical, instrumentation, and control system detailed designs for the $5 million

WSE was engaged by Zinfra Group

WSE was engaged by Zinfra Group to provide the engineering design of Design and Construct augmentations to the Moura

WSE was engaged by Zinfra Group in 2017

WSE was engaged by Zinfra Group in 2017 to carry out detail design of HV Switchboards for QUU’s Luggage Point,

BRANDS WE WORK WITH